WALL Acrylic anti-mildew paint will be applied on gypsum plaster.
CEILING Acrylic anti-mildew ceiling paint will be applied on gypsum plaster.
SKIRTING will be ceramic.
WINDOWS Blind frame will be made from galvanized box profile. Heat control coated double glass will be installed over the aluminum joinery. The windows will be double-hung. Window joinery accessories will be made of imported materials. (Hinges, espagnolettes, locks and their additions, transom scissors, door handles, etc.)
AIR CONDITIONING INSTALLATION Split air conditioning infrastructure installation (copper pipe and drainage) in accordance with the project and details
will be installed.< /div>
KITCHEN CABINETS High Gloss will be the one to work with in serious kitchens. There will be ceramic tiles between the countertop and the upper cabinet. Hinges will be brake hinges. Aluminum base, adjustable legs
will be made.
BEDROOMS
FLOORING Heat and sound insulation in accordance with the project and details. Laminate parquet floor covering on screed
will be done.
WALL Acrylic paint will be done on gypsum plaster.
CEILING Acrylic ceiling paint will be done on gypsum plaster.
CUPBOARD It will be High Gloss to work with a serious kitchen.
AIR CONDITIONING INSTALLATION Split air conditioning infrastructure installation (copper
pipe and drainage) will be installed in the master bedroom in accordance with the project and details.
BATHROOM, TOILET AND HOT WATER
FLOORING Ceramic coating will be applied on the screed in accordance with the project and details.
WALL tiles. will be coated.
CEILING will be painted with moisture resistant paint. General Waterproofing will be applied to the walls. Bathroom
cabinet and decorative mirror will be installed. Above or under counter sink installation will be made in accordance with the project and details. It will be assembled with a single body battery and siphon. The toilet bowl will be installed.
Round towel holder and double hangers will be installed. An acrylic shower tray in dimensions appropriate to the project will be assembled. A shower cabin will be installed in dimensions appropriate to the project. A 3-function bathroom mixer set will be installed along with a phone holder and a hand
shower. Strainer will be installed.
Ventilation glass will be made in accordance with the project.
HOT WATER There will be an electric boiler in accordance with the project principle.
BUILDING FEATURES
ENVIRONMENTAL LIGHTING
Apartment landscape areas and common areas will be illuminated by installing lighting elements in accordance with the project
ELECTRICAL INFRASTRUCTURE.
The electricity needs of the apartment will be met from the transformer center to be built according to KIB-TEK standards.
TELEPHONE AND INTERNET SYSTEM
TRNC. The telephone and internet needs of residences will be met with the infrastructure to be built in accordance with telecom standards. Telephone data contact boxes will be located at the entrance of each building. Telephone and internet lines will be installed in all
rooms for each apartment.
TV INSTALLATION
A central satellite antenna system will be installed in the apartment. 1 satellite dish antenna will be installed in the system.
DRINKING AND USE WATER
Domestic cold water will be supplied from a personal tank. Potable water tanks will be included in the project.
ELVOR
An elevator with an emergency rescue device, in accordance with traffic calculations and fire regulations, will be supplied and installed in the apartment.
>
APARTMENT ENTRANCE
There will be a video intercom system for entrance door control in each apartment.
Send Message