Karibu Estates
Yetkili Ergül Mullahasan
Telefon +905488590009 / +905338616202

1+0 1+1 2+1 3+1 FLATS FOR SALE IN İSKELE

For Sale Flat - Iskele, Long Beach, property-Details.north-cyprus

£ 129,000

1+0 1+1 2+1 3+1 FLATS FOR SALE IN İSKELE 1+0 1+1 2+1 3+1 FLATS FOR SALE IN İSKELE 1+0 1+1 2+1 3+1 FLATS FOR SALE IN İSKELE
1+0 1+1 2+1 3+1 FLATS FOR SALE IN İSKELE 1+0 1+1 2+1 3+1 FLATS FOR SALE IN İSKELE

Hızlı Bakış

101evler İlan No #328013 İlan Tarihi 13/11/2023
Konum Iskele, Long Beach Tapu Türü Exchange Deeds
Durum For Sale Emlak Türü Houses / Flat
Metrekare 58 m2
Oda Sayısı 1+0 Banyo 1
Bina Yaşı Proje Aşamasında Kat Sayısı 0
Eşya Durumu Unfurnished Dairenin Katı 0

Açıklama

  • For Sale
  • Iskele – Long beach
  • On 70,000 m2 land
  • 30,800 m2 construction area
  • 2,500 m2 social activity area
  • 19 blocks
  • 428 residences
  • 8 shops – workplaces
  • 188 x (1+0) studio flats : 58 m2 – 67 m2 : 1 bathroom 1 WC
  • 164 x 1+1 flat: 75 m2 – 95 m2 : 1 bathroom 1 WC
  • 60 x 2+1 flat : 95 m2 - 130 m2 : 2 bathrooms 2 WC
  • 16 x 3+1 flat : 146 m2 - 172 m2 : 2 bathrooms 2 WC
  • Green area, walking paths, gym, cafe, restaurant, pool, pool bar,
  • Basketball court, tennis court, bars, spa center
  • Central generator
  • 24/7 security site
  • Equivalent
  • Delivery in December 2027
  • Sales price: 1+0 – studio: 129,000 stg – 161,000 stg
  • Sales price: 1+1 flats: 149,000 stg – 225,000 stg
  • Sales price: 2+1 flats: 229,000 stg – 313,000 stg
  • Sales price: 3 +1 flats: between 350,000 stg – 454,000 stg
  • + 5% VAT + transformer contribution
  • Payment plan:
  • Campaign 1:
  • 5% – deposit
  • 30% – preliminary down payment – within 15 days
  • 30% – 36 months until construction is completed
  • 35% – 48 months with maturity difference
  • Campaign 1:
  • 5% – down payment
  • 30% – down payment – Within 15 days
  • 40% – 36 months until construction is completed
  • 25% – 12 / 24 months with interest difference
  • Campaign 1:
  • 5% – deposit
  • 30% – preliminary down payment – within 15 days
  • 65% – 36 months until construction is completed
    • Campaign 1:
    • 5% – deposit
    • 10% – preliminary down payment – within 15 days
    • 10% – down payment / interim payment 3rd month single payment
    • 30% – 30 months until construction is completed
    • 35% – 12 months

Notlar