For Sale Apartment - Tatlısu, Famagusta, Northern Cyprus GENERAL SPECIFICATION This document outlines the technical specifications of the housing blocks of the AURORA residential project. The Technical Specification details the general design and implementation principles, as well as provides an overview of the systems and materials to be used. All architectural materials used in the visuals, including sanitary ware, joinery, and doors, will be specified. The brand, design, color, and model will not constitute the basis for the manufacturing to be carried out. FOUNDATION EXCAVATION REINFORCED CONCRETE FRAMEWORKS FOUNDATION FILLING WORKS CONCRETE ON TOP OF AGGREGATE. -The structures are constructed in accordance with the static project prepared and approved according to the current legislation, designed with TS708 reinforcement steels and TSEN197/1 Portland cement. BRICKS WORKS -Exterior walls are built with 10x25x30 horizontal bricks, interior walls are built with 10x20x30 vertically placed bricks. Quality fired perforated bricks in 1:2:8 (cement:lime:sand) ratio are used with mortar. EXTERIOR PLASTER WORKS After all surfaces are cleaned, the first layer is applied at a ratio of 1:3 (cement: sand) and with water, not exceeding 0.5 cm. Plaster mesh is laid on the joints of columns and beams with the wall. In the second layer of plaster, the surfaces of the slabs are filled with a 1:2:8 (cement:lime:sand) mortar and/or ready-made plaster, and their surfaces are leveled with a gauge. It is applied by rubbing. INTERIOR PLASTER WORKS After all surfaces are cleaned, it is applied on the walls at a ratio of 1:3 (cement: sand) and with water, not exceeding 0.5 cm. The connection of columns and beams with the wall. Plaster mesh is laid in their place. 2nd hand plaster in 1:2:8 (cement:lime:sand) ratio mortar and/or ready-made plaster, the gaps of the slabs, which were removed at 2 m intervals, are filled and their surfaces are leveled with a gauge. On the third hand, gypsum plaster and satin plaster are applied. On Ceilings: After the floor is ready for plastering, a mesh is laid on the hollow block ceiling and gypsum plaster and satin plaster are applied on the montotex or equivalent material, and gypsum plaster and satin plaster are applied on the gypsum board. SCREEDS The screeds in closed areas are dry screed and will be smoothed by rubbing the surfaces with a helicopter. However, in wet areas and open areas, 300-dose screed mortar is leveled with slabs beforehand and leveled with a screed. INSULATION WORKS After all the surfaces to be insulated are cleaned of dust and burrs, necessary modifications are made and they are made ready for isolation. A) Double layers of bitumen-based primer are applied to the foundation connection beams. B) Cement-based insulation is applied to terraces and balconies, and cement-based insulation is applied up to 50 cm on the floor, on the walls of the room, and up to 2.2 m in places with showers. C) Bitumen lining on eaves. D) Insulation material on the roofs of 1+1 Lofts. E) Buildings in villas. F) Roofs of buildings in villas. ELECTRICAL WORKS It is made in accordance with the project prepared and approved according to the current legislation and KIB-TEK rules. The materials are selected by the project authors. CERAMIC ADHESIVES Ceramic adhesive in C1TE standard is used indoors and C2TE standard is used outdoors. FLOOR FLOORING & TILE WORKS Interiors, bedrooms, wet areas, bedrooms, general usage areas, balconies, and steps will have different flooring materials depending on the room type. ALUMINUM WORKS The windows of all buildings will be made of double-glazed normal standard case aluminum. PAINT WORKS Interior and exterior paints will be used according to specific standards. ENTRANCE DOORS Steel doors will be used as entrance doors for all the properties on-site. WOODEN DOORS WORKS Flat interior doors and safes in all buildings will be made from MDF material. KITCHEN BENCHES All kitchen cabinets will be covered with chipboard and other materials specified by the project owners. WALL CABINETS The surfaces visible from the inside will be manufactured using high gloss material. SINKS & FOUNTAINS Models of sinks, fountains, and sanitary ware will be determined by the project authors. RAILING Internal and exterior railings will be made of specific materials as per the design. STAIRS Villas and loft apartments will have different types of stairs and railings. SANITARY INSTALLATION WORK Different types of pipes and materials will be used for water installations and wastewater installations. HOT WATER Water heaters of different capacities will be used depending on the size of the flats. WATER TANK A central water tank will be built on-site for all buildings. SUSPENDED CEILINGS Suspended ceilings will be constructed according to the design of the interior architect. LANDSCAPE The landscaping in the site will be determined by the project owners. ALL SPACE & BUSINESS ITEMS The authors reserve the right to make changes considering the integrity and functionality of the project. WASTE CONTAINER LOCATION Waste containers will be placed at specific points determined by the project owners and in specified capacities. GENERAL CONDITIONS The design may vary according to the color and harmony chosen by the authors or the contractor company. Materials in 3D images are for demonstration purposes only. Owners have restrictions on exterior modifications or changing colors.
Graphs, square meter prices and property index are created in cooperation with 101evler and REIDIN Data Analytics.
34.00% of the people living in Tatlısu Famagusta region work as Private Sector and 12.10% as Artisan. 23.90% of the people living in this region are in the 35-44 age range. In addition, 37.60% of the people living in the region have High School education.
Visit our Region Analysis page for more detailed information.
The demographic information on this page is shown in cooperation with LIPA Consultancy.
Send Message