In this project, which is just one of our Rental Income Investment Projects that we have in many regions, you can contact us and get detailed information to take advantage of our great opportunities for 1+1, 2+1 and 3+1 flats and workplaces with 3+1 and other projects.
We are happy to serve you, our valued customers. Because we are;
We are the address of profitable and satisfying real estate.
Monthly rent payment will be made in the amount specified below in cash payments.
SHOP £5,000
RESIDENCE (2+1) £600
RESIDENCE(3+1) £750
RESIDENCE(3+1) £900
/p>
General Description of Our Projects
INTERIOR OF THE FLAT
CORIDOR AND ENTRANCE
To the project and its details suitable heat and sound insulation will be 60x60 ceramic on screed. ENTRANCE DOORS The two sides of the door wing of the apartment entrance door, the jamb and the frame will be wooden
covered on MDF and will be.
FLAT ENTRANCE DOOR SILL There will be a marble or granite door threshold.
< p>ACCESSORIES The apartment door number, binoculars, doorknobs and door locks with rosettes will be made of stainlesssteel and / or metal and / or brass painted in brass color.
INTERIOR DOORS American Press door, glassless and interior door leaf, casing, sill will be made and replaced with metal
parts. Door handles will be stainless steel.
HALL AND KITCHEN
FLOORING In accordance with the project and its details, 60x60 ceramic tiles on screed will be made on heat and sound insulation
.
WALL Acrylic anti-mildew paint will be made on gypsum plaster.
CEILING Acrylic anti-mildew ceiling paint will be made on gypsum plaster.
BABIN will be ceramic.
WINDOWS Blind casing will be made of galvanized box profile. Heat control
coated double glazing will be installed on aluminum joinery. Windows will be double opened. Window joinery accessories will be of imported
material. (Hinges, espagnolette, locks and additions, transom scissors, door handles, etc.)
AIR CONDITIONING INSTALLATION Split air conditioner infrastructure installation (copper pipe and drainage) will be installed in accordance with the project and its details.
/p>
KITCHEN CABINETS High Gloss will be the place to work with serious kitchen. Between the counter and the upper cabinet
there will be ceramic tiles. Hinges will be hinges with brakes. Aluminum plinth, adjustable feet
will be made.
BEDROOMS
FLOORING Laminated parquet floor covering on screed on heat and sound insulation in accordance with the project and its details
will be done.
WALL Acrylic paint will be made on gypsum plaster.
CEILING Acrylic ceiling paint will be made on gypsum plaster.
CLOSET A serious kitchen will be worked with High Gloss
AIR CONDITIONING INSTALLATION Split air conditioner infrastructure installation (copper
pipe and drainage) will be installed in the master bedroom in accordance with the project and its details.
BATH, TOILET AND HOT WATER
FLOORING In accordance with the project and its details, ceramic coating will be made on the screed and waterproofing.
WALL will be covered with tiles.
The CEILING will be painted with moisture resistant paint. General Waterproofing will be applied to the walls. Bathroom
Cabinet and decorative mirror will be installed. Over-the-counter or under-counter sinks will be installed in accordance with the project and its details
. It will be assembled with a single body battery and siphon. WC pan will be installed.
Round towel rail and double hanger will be installed. Acrylic shower tray in the dimensions suitable for the project
will be assembled. The shower cabin will be installed in accordance with the project. A 3-function set of bathroom faucets will be installed, along with a phone holder and a hand shower. Strainer will be installed.
Ventilation glass will be made in accordance with the project.
HOT WATER There will be an electric boiler suitable for the project.
BUILDING FEATURES
ENVIRONMENTAL LIGHTING
Landscape areas and common areas will be illuminated by installing suitable lighting elements for the project.
ELECTRICAL INFRASTRUCTURE
The electrical need of the apartment It will be met from the transformer center to be built according to KIB-TEK standards.
GENERATOR SYSTEM
A generator will be installed to meet the needs of all common areas of the apartment.
PHONE AND INTERNET SYSTEM
TRNC. Telephone and internet needs of the residences will be met with the infrastructure to be built in telecom standards. Telephone data contact boxes will be located at each building entrance. Telephone and internet lines will be installed in allrooms for each flat.
TV INSTALLATION
Central satellite antenna system will be installed in the flat. 1 dish antenna will be installed in the system
.
DRINKING and DHW WATER
Cold water for domestic use will be supplied from personal storage. Potable water tanks will be located in the project.
LIFT
Traffic account and fire direction in the apartment
Show original descriptionGraphs, square meter prices and property index are created in cooperation with 101evler and REIDIN Data Analytics.
40.20% of the people living in Aşağı Girne Kyrenia region work as Private Sector and 14.70% as Freelance. 22.70% of the people living in this region are in the 65+ age range. In addition, 41.40% of the people living in the region have University and Beyond education.
Visit our Region Analysis page for more detailed information.
The demographic information on this page is shown in cooperation with LIPA Consultancy.
Kıbrıs Girne 3+1 Daire. KKTC,GİRNE MERKEZ, KUZEY KIBRIS
1+1, 2+1, 3+1 Квартиры и Рабочие места для Инвестиций с Доходом от Аренды от Проекта в Гирне Центре
1+1, 2+1, 3+1 Wohnungen und Arbeitsplätze für Investitionen mit Mieteinnahmen aus dem Projekt im Girne Center
1+1، 2+1، 3+1 آپارتمان و محل کار برای سرمایه گذاری با درآمد اجاره از پروژه در مرکز Girne
Send Message